
Project Details
ROOF SIZE
8,400 sq ft
DURATION
4 days
PRODUCT
60-mil TPO — White
WARRANTY
20-year NDL membrane warranty
About This Project
Full removal and replacement of a failed EPDM system on a 3-storey mixed-use building. We installed 60-mil TPO with a fully adhered system over new polyiso insulation to bring the R-value up to current code. Drain locations were reconfigured to eliminate two chronic ponding areas that had been a recurring problem for the building owner.
Project Photos




Want Results Like This?
Free estimates, no pressure. Most roofs assessed within 24 hours.